From engineering drawings
to operational readiness.
ADB SAFEGATE provides complete project delivery — installation, system integration and commissioning — using the same engineering expertise that designed the solution.
Built by engineers who designed it.
When the same team that designed the system installs it, there are no translation errors between specification and execution. ADB SAFEGATE project delivery means the engineering intent is understood at every stage — from the first cable pull to the final commissioning certificate.
Installation
OEM-standard installation from civil works through hardware fitting to full system integration. LINC connectivity and CORTEX SERVICE readiness built in from day one.
Commissioning
System testing, photometric verification, ORAT sign-off and regulatory documentation. Certified ready for first aircraft.
Installed exactly as engineered.
The team that designed the system understands every dependency, tolerance and integration requirement. No interpretation. No post-installation corrections.
Planning a new airport project?
Talk to our Project & Installation specialists about your programme and timeline.